Commissioning progress update
Lot’s more progress. We’re targeting Saturday for a shakedown cruise. Not everything will be done, but we’ll be seaworthy, with most of the Quality of […]
Couch installed
Burrow does a really nice job with their furniture. It’s not high-end, but it’s modular and durable. I’m not sure how else we would have […]
Heating use cases
I’m not sure I got all of this right. But it helped me get my head around the basic design. In most cases, the system […]
Heat complexity
The hot water and cabin heat are designed to be flexible and configurable, but it’s leading to some complexity, which we’ll need to streamline for […]
Blinds
We got the proof-of-concept blinds installed. It’s a really tight fit, up under the valence, but we made it work. This is a huge load […]
Dinghy!
We took delivery of our dinghy on Friday. I have been almost as excited by the dinghy as by the big boat. Our old dinghy […]
Commissioning Visit #3
Dave is getting ready to install the hydronic heat. The main unit will go on the port side underneath the galley. I like it there […]
Turtle Toilets
Our last boat had manual jabsco pump toilets. They did the job and were easy to repair and service, but it always felt a bit […]