Lot’s more progress. We’re targeting Saturday for a shakedown cruise. Not everything will be done, but we’ll be seaworthy, with most of the Quality of Life stuff ready. We hope for 90% of the commissioning to be done by August 10th or so.
Also, just found out that I need to apply for my own MMSI number and Ship Station License from the FCC to get my AIS broadcast ID. As usual, trawlerforum has been super helpful.
Taking the ladder home Got the Fusion DVD player working. Testing our BluRay player from the HDMI port behind the couch. The Fusion cabling is chaotic. The HDMI connection is flaky. Hydronic install Waiting to go in front of the port fuel tank Fresh water filters moved Under-stair heat duct Main hydronic control panel Defroster! Pilot house thermostat We moved the inverter control panel and put the remotes here (auto pilot and searchlight) We have provisions! …and silverware! …and… baggies! Essential supplies Main propane system is installed Guyer did very nice work with the chocks Tiedown for the crane Stern rails (for BBQ mount) installed BBQ propane will go in this locker and be plumbed up to rail. Inverter/charger panel moved and Maertron MFD installed